Friday, 4 August 2017

KTU M.Tech CS 2016-2018 Batch Project Schedule CECherthala

M.Tech CS 2016-2018 Batch Project Schedule


Project Area and Topic identification: Date : 9th August 2017
(Submit a report)

Project topic Presentation and Discussion   Date : 21st August 2017
Expected level of completion : Literature survey
Documents required : Introduction, Problem statement, Survey of papers read. Project objective proposal (slides)

First review of Survey Date : 14th September 2017
Expected level of completion : Literature survey
Documents required : Report, presentation slides, previous review reports,  project diary.

Second review of Survey and Design Presentation Date : 3rd  October 2017
Expected level of completion : Literature survey + Design (Architecture and working)
Documents required : Report, presentation slides, previous review reports, Draft Survey paper, project diary.

Design Presentation with complete set of algorithms and tool study Date: 31st  October 2017
Expected level of completion : Literature survey + Design (Architecture and working,  Algorithms,Sequence diagram etc)+Study of tools with 10 % implementation 
 Documents required : Report, presentation slides, previous review reports, Draft Survey                                                                   paper, project diary.

Final Review Date : 15th November 2017
 Expected level of completion : Literature survey + Design (Architecture and working,Algorithms,Sequence diagram etc)+Study of tools with 15 %implementation (Demo)
 Documents required : Project final report, presentation slides, previous review reports,                                      Survey paper, project diary.

Note 1 : The project diary should be submitted to the project coordinator every Monday after getting it signed from the respective guides.
Note 2 : There is no change in the scheduled dates. If any one is not presenting their work on scheduled date no further chances will be given. However students can request for scheduling the presentation on a date before the scheduled presentations.  

Monday, 19 September 2016

M tech CS 2016-2018 batch project schedule

M.Tech CS 2016-2018 Batch Project Schedule


Project Area and Topic identification: Date : 9th August 2017
(Submit a report)

Project topic Presentation and Discussion   Date : 21st August 2017
Expected level of completion : Literature survey
Documents required : Introduction, Problem statement, Survey of papers read. Project objective proposal (slides)

First review of Survey Date : 14th September 2017
Expected level of completion : Literature survey
Documents required : Report, presentation slides, previous review reports,  project diary.

Second review of Survey and Design Presentation Date : 3rd  October 2017
Expected level of completion : Literature survey + Design (Architecture and working)
Documents required : Report, presentation slides, previous review reports, Draft Survey paper, project diary.

Design Presentation with complete set of algorithms and tool study Date: 31st  October 2017
Expected level of completion : Literature survey + Design (Architecture and working,  Algorithms,Sequence diagram etc)+Study of tools with 10 % implementation 
 Documents required : Report, presentation slides, previous review reports, Draft Survey                                                                   paper, project diary.

Final Review Date : 15th November 2017
 Expected level of completion : Literature survey + Design (Architecture and working,Algorithms,Sequence diagram etc)+Study of tools with 15 %implementation (Demo)
 Documents required : Project final report, presentation slides, previous review reports,                                      Survey paper, project diary.

Note 1 : The project diary should be submitted to the project coordinator every Monday after getting it signed from the respective guides.
Note 2 : There is no change in the scheduled dates. If any one is not presenting their work on scheduled date no further chances will be given. However students can request for scheduling the presentation on a date before the scheduled presentations.  

Mtech CS 2015-2017 batch project schedule

Mtech CS 2015-2017 Batch Project Schedule


Project topic Presentation   Date : 23rd September 2016
            Expected level of completion : Literature survey
            Documents required : Introduction, Problem statement, Survey of papers read. Project objective proposal (report and slides)

First review of Survey Date : 19th  October 2016
            Expected level of completion : Literature survey
            Documents required : Report, presentation slides, previous review reports,  project diary.

Second review of Survey and Design Presentation Date : 2nd & 3rd  November 2016
            Expected level of completion : Literature survey + Design (Architecture and working)
            Documents required : Report, presentation slides, previous review reports, Draft Survey paper, project diary.

Design Presentation with complete set of algorithms and tool study Date: 22nd & 23rd November 2016 
                   Expected level of completion : Literature survey + Design (Architecture and working,  Algorithms,Sequence diagram etc)+Study of tools with 10 % implementation 
            Documents required : Report, presentation slides, previous review reports, Draft Survey                                                                   paper, project diary.

Final Review Date : 5th , 6th and 7th December , 2016
             Expected level of completion : Literature survey + Design (Architecture and working,                                                                                      Algorithms,Sequence diagram etc)+Study of tools with 15 %                                                                            implementation (Demo)
             Documents required : Project final report, presentation slides, previous review reports,                                      Survey paper, project diary.

Note 1 : The project diary should be submitted to the project coordinator every monday after getting it signed from the respective guides.
Note 2 : There is no change in the scheduled dates. If any one is not presenting thier work on scheduled date no further chances will be given. However students can request for scheduling the presentation on a date before the scheduled presentations.  

Mtech CS 2015-2017 batch project schedule

Mtech CS 2015-2017 Batch Project Schedule


Project topic Presentation   Date : 23rd September 2016
            Expected level of completion : Literature survey
            Documents required : Introduction, Problem statement, Survey of papers read. Project objective proposal (report and slides)

First review of Survey Date : 19th  October 2016
            Expected level of completion : Literature survey
            Documents required : Report, presentation slides, previous review reports,  project diary.

Second review of Survey and Design Presentation Date : 2nd & 3rd  November 2016
            Expected level of completion : Literature survey + Design (Architecture and working)
            Documents required : Report, presentation slides, previous review reports, Draft Survey paper, project diary.

Design Presentation with complete set of algorithms and tool study Date: 22nd & 23rd November 2016                    Expected level of completion : Literature survey + Design (Architecture and working,                                                                                      Algorithms,Sequence diagram etc)+Study of tools with 10 % implementation 
            Documents required : Report, presentation slides, previous review reports, Draft Survey                                                                   paper, project diary.

Final Review Date : 5th , 6th and 7th December , 2016
             Expected level of completion : Literature survey + Design (Architecture and working,                                                                                      Algorithms,Sequence diagram etc)+Study of tools with 15 %                                                                            implementation (Demo)
             Documents required : Project final report, presentation slides, previous review reports,                                      Survey paper, project diary.

Note 1 : The project diary should be submitted to the project coordinator every monday after getting it signed from the respective guides.
Note 2 : There is no change in the scheduled dates. If any one is not presenting thier work on scheduled date no further chances will be given. However students can request for scheduling the presentation on a date before the scheduled presentations.  

Wednesday, 9 September 2015

Mtech CS 2014-2016 batch project schedule

Mtech CS 2014-2016 batch project schedule

Project topic finalization   Date : 11th September 2015
            Documents required : Project proposal (report and slides)

First review Date : 30th September 2015
            Expected level of completion : Literature survey + 5 % implementation
            Documents required : Report, presentation slides, previous review reports,  project diary.

Second review Date : 21st October 2015
            Expected level of completion : Literature survey + 10 % implementation
            Documents required : Report, presentation slides, previous review reports, Draft Survey                       paper, project diary.


Final Review Date : 9th November 2015
             Expected level of completion : Literature survey + 15 % implementation
             Documents required : Project final report, presentation slides, previous review reports,                         Survey paper, project diary.


Note : The project diary should be submitted to the project coordinator every monday after getting it signed from the respective guides.